FAQs
The questions that come before a first message
Nine questions a Dubai homeowner actually asks before contacting a renovation contractor, answered without a guarantee, a rate card or a completion date.
Every answer stays in the page whether or not JavaScript runs, each one is linkable, and none of them is hidden behind a control you have to discover.
Frequently asked questions
What is a scope review?
It is an internal suitability review of your inquiry, followed — if it proceeds — by a site survey and a written scope. It is not automatic acceptance, not a quotation and not a project instruction.
The review looks at the property type, the community, the scope and our current capability. Some inquiries are declined, and being declined costs you nothing but the message you sent.
What should a first message include?
None of this is required, but it lets us give you a useful answer instead of a request for more information.
- The community, from the ten we work in.
- Villa or townhouse, and whether you own and occupy it.
- Which rooms or parts of the home the work concerns.
- The outcome you want, rather than a list of materials.
- Whether the household stays in the home during the works, and any date that genuinely constrains you.
- Anything already prepared — drawings, a scheme, earlier quotations or community correspondence.
Please do not send bank details, payment information or identity documents in a first message. No stage of a scope review requires them.
What defines the price basis?
The price basis is the set of documents that make a total meaningful: measured items with quantities and rates, plus the assumptions, exclusions, allowances and provisional sums behind them.
Two contractors can quote the same figure for materially different work. The basis is what lets you see which one you are actually buying.
What are assumptions, exclusions, allowances and provisional sums?
- Assumption
- Something the price takes for granted because the survey could not verify it — access, service capacity, substrate condition, working hours.
- Exclusion
- Something the price deliberately does not cover, stated before you commit rather than discovered later.
- Allowance
- A named budget held for a selection that has not been made yet, reconciled against the actual chosen item.
- Provisional sum
- Work whose extent cannot be established until something is opened up, stated as provisional rather than buried in a total.
What can change the cost or the programme?
A condition that differs from a written assumption, a change you request, a selection made later than planned, a lead time on an ordered item, or an approval that is delayed or refused.
Each of those becomes a written change stating its scope, cost and programme effect, and it proceeds only once accepted. Nothing is carried out on a verbal agreement.
Which approvals might apply to my property?
That depends on the property, the community and the exact work. Some scopes require permission from a community or master developer, an authority, or a utility provider; some do not.
We identify the applicable path during Planning, name who must issue each permission, and write the dependency into the programme. We do not claim pre-existing approval status anywhere, and we do not claim a permission will be granted.
Can work happen in an occupied home?
Frequently yes, and the phasing that makes it workable is written into the scope rather than agreed week by week.
- Work areas are physically separated from living areas, with protection to the routes trades use.
- Wet areas are sequenced so the household is not left without a usable bathroom at an unplanned moment.
- Service shutdowns are planned, notified in advance and kept to defined windows.
- Dust, noise and waste routes are agreed before mobilisation.
Phasing constraints change what the work costs, and that cost is priced openly.
What evidence is recorded before work is covered?
Waterproofing and its testing, falls to drainage, first-fix electrical and plumbing routes, fixings and framing, and structural interfaces — all recorded while they are still visible.
Once a ceiling is boarded or a floor is laid, that work cannot be inspected without destroying the finish, so the record has to be made at the right moment or not at all. It is compiled into the completion evidence at handover.
Why are the gallery and the review still pending?
Because neither has cleared its gate yet. A published project record needs all eight fields — project code, community and property type, customer objective, before condition and findings, scope with inclusions and exclusions, approvals and price drivers and changes, hidden-work and completion record, and exact written publication permission.
A published customer review needs four: the original source, a verified reviewer identity and relationship, a project-truth match, and exact written permission for the text, the identity and the placement.
Until then the slots stay dated and visibly empty. See Gallery & Evidence.
Still the wrong question?
Ask us the real one. Describe the property, the community, the rooms involved and the outcome you want.
Contacting Rawdha starts a review, not a project. Site information is not a quotation, offer, contract or binding price; the inquiry may be declined.